Industrial Automation Technician with 15+ years in manufacturing & machining – available
Posted by AAE Immigration on June 26, 2007
About Candidate (ref: ARus) Email us if interested
Automation Technician – Field Service Engineer with 15+ years of experience in manufacturing and machining.
Broad skills as a machinist and millwright. Knowledgeable in pneumatics, hydraulics, and basic electrical systems. Key strength in troubleshooting and repair. Skilled interpretation of blueprints, schematics, and technical manuals.
Skilled operation of forklifts, jig lifts, lathes, mills, drill presses, power tools, and hand tools. Versed in PLC programming of Allen-Bradley and similar equipment. Versed in providing technical training for groups of up to 50.
Organized and accountable, achieving all productivity objectives with little or no supervision. Able to relocate and travel extensively. Recognized as a quality and safety oriented team member with an exceptional work ethic.
Experience
Maintenance Technician G.P. Plastics April2006-April2007
Maintenance Technician, Ecolab,Garland Dec.2001-March2006
Maintenance Technician, KIK International, 2001-Jly 2001
Provide preventative maintenance and repair of plastic injection blow mold, filling, sleeving, labeling, packaging, palletizing, and wrapping equipment.
Document all repair and maintenance activities. Recommend improvements to current processes and procedures. Meet team targets for safety, efficiency, and productivity. Participate in quality and safety improvement programs.
Maintenance Technician, American Gypsum, Nov.99-2001
Performed preventative maintenance and repair of mining equipment (rock crushers, screw conveyors, gear boxes, pumps, compressors), conveyors, dryers, saws, and scissor lifts for wallboard manufacturing operations.
Documented all repair and maintenance activities. Achieved all quality, safety, and productivity goals.
Mobile Mechanic, Affiliated Building Services / FedEx, Golden
Provided repair and preventative maintenance of package moving equipment for the Federal Express contract.
Planned, implemented, and documented all facets of route logistics. Traveled to twelve facilities from Colorado Springs to Cheyenne WY and from Grand Junction to DIA.
Millwright, Austin Industrial, Laporte, TX May 94-May97
Maintained and repaired process equipment for the PPG Chemical Plant, including pumps, compressors, agitators, mechanical seals, and machinery alignment. Successfully completed extensive technical training.
Served as Backup Foreman, providing leadership for a team of 10 millwrights. Selected to serve as Safety Coordinator, providing leadership in Safety Education and Awareness programs for a team of 160.
Millwright, multiple contracts and companies, Texas 1983-1994
Provided installation, troubleshooting, repair and maintenance of a wide range of rotating equipment.
Education
Extensive employer-sponsored training: Programmable Logic Controllers, Forklift Operations, Jig Lift Operations, TechPro Pump and Seal Maintenance Operations, Hydraulics, and Pneumatics, Electrical Safety, Assured Grounding, Lockout/Tagout, Process Safety Training, Respiratory Protection, Emergency Evacuation, Confined Space Work Procedures, HazCom, Fall Protection Training, Fire & Safety, Scaffold Tagging, Asbestos and Lead Awareness.